Within its three-year plan, the City of Trois-Rivières will undertake several buildings, civil engineering, and municipal projects. Some will be recurrent: river flow regulation, and municipal infrastructures. The City will pay close attention to costs forecasts and reviews, for the following projects:
- Enhancement of the Le Flambeau historical borough, Phase II;
- Steel frame of the administrative building and the amphitheatre stage (package 107);
- Foundations, waterproofing, and insulating of the amphitheatre (package 224-051);
- Construction of eight tennis courts, a service building and a garage, Martin-Bergeron Park;
- River flow regulation: Milette, Bettez and Lacerte rivers;
- Banks stabilization, Milette river behind Louis-Lacroix street;
- Reconstruction of electrical pipes, Draveurs Avenue;
- Construction of a railway crossing, Charbonneau Street;
- Construction of a welcome sign for TRSSL.